3rd party inspection to Ngoajane South Adit Entrance to Lesotho under river steel tunnel section refurbishment project- 19000 SQM grit blasted and coatted with Corrocoat ZIP E4.5 metre diameter bulk head doors coated with ZIP EAcid bath blast and coat on siteAir blocker in concrete section 4.5 metre diameter in Lesotho under river tunnelAir compressors for grit blasting and spray applicators in Lesotho under river tunnel projectAir hose moisture trap connectorsAIR MOVEMENT FANS FOR TUNNEL ATMOSPHERE CONTROLBLAST POTS FOR GRIT BLASTING LESOTHO UNDER RIVER TUNNEL STEEL SECTIONS OVER 6 SITESGrit blasted surface prep and ZIP E coating application to specificationGrit blasting to SA3 a 3,5 m diamter steel pipeline under a riverStripe coating weldsCorrocoat ZIP E coating application to 3.5 metre diameter under river steel section pipelineCorrocoat site forkliftsCorrocoat mobile workshop offshoreCorrocoat ZIP E coating application in power plant cooling ducting sectionsCorrocoat ZIP E application to cooling duct systemDiesel particulate filters installed on Corrocoat fork lifts and generatorsCoated entrance to the under river system in LesothoBulkhead entrance to under river work sites in LesothoEnvironmental testing under river tunnel sectionsPipe section refurb offshoreFlue can coated with Corrocoat Corrothane XT at a height of 200 metresFlue can surface preparation with grit blasting for coating application of Corrocoat CXT and VEUnder river tunnel coated with Corrocoat ZIP EGrit blasted tunnel sections ro SA3 and surface held with dehumsSpark testingLong length tunnel sections to 900 metresCoated tunnel section to DFT 1200 microns 3rd party inspectionMetering section where internal pipeline prepped and coated with ZIP ENgoajane Camp Site in Lesotho ProjectNorth adit entrance at Ngoajane Offshore tank prepped and coatedOffshore pressure vessel refurbishmentOffshore pressure vesselComplete recoating of pressure tankVertical penstock of 110 metres height entanceFPSO pressure vessel refurbishmentFPSO West Africa FPSO pressure vessel refurbishmentScaffold construction at 200 metre height flueSpool section blasted and coated with ZIP ECoating operations undergroundTunnel access coating project